Space and Defense Contracting
|
| K-25 Main Plant Demolition Project |
| Oak Ridge, South Dakota, United States |
| 2006 - 2009 |
| Nature of Representation:
Arbitrations
|
| Nature of Representation:
Trials / Litigation
|
| Government:
Federal
|
On behalf of Department of Energy contractor, defended against claims by subcontractor for alleged differing site conditions, interference in work operations, improper bidding practices and fraud in connection with a subcontract to demolish and dispose of radioactive waste from contaminated process buildings associated with the K-25 uranium enrichment plant, built as part of the Manhattan Project.
|
| Department of Energy Radioactive Waste Landfill |
| Oak Ridge, Tennessee, United States |
| 2005 - 2007 |
| Nature of Representation:
Trials / Litigation
|
| Government:
Federal
|
Dispute with a design-build environmental remediation subcontractor relating to a radioactive waste landfill at the Department of Energy facility.
|
| Weapons Station Earle Hazardous Waste Facility |
| New Jersey, United States |
| 1997 - 2007 |
| Nature of Representation:
Trials / Litigation
|
| Government:
Federal
|
Represented client in default termination claims before the Armed Services Board of Contract Appeals.
|
| Kandahar Airport |
| Afghanistan |
| 2006 |
| Nature of Representation:
Arbitrations
|
| Government:
Federal
|
Represented subcontractor in termination for default on airport project to be used by U.S. military forces.
|
| Melton Valley Project |
| Oak Ridge , Tennessee, United States |
| 2004 - 2006 |
| Nature of Representation:
Construction, Engineering and Project Contracts
|
| Government:
Federal
|
Restructuring of Department of Energy privatization contract for design/build/operation of a facility for re-packaging and processing nuclear waste from a firm-fixed price to a cost reimbursable contract. Also resolved $18 million in disputes.
|
| Spent Nuclear Fuel Facility |
| Idaho Falls, Idaho, United States |
| 2004 - 2006 |
| Nature of Representation:
Mediations / Adjudications / DRBs / Negotiations
|
| Government:
Federal
|
Negotiated no-cost termination of a privatization contract with the Department of Energy to design, license, build and operate a processing and storage facility for spent nuclear fuel. Also resolved several substantial claims for additional compensation.
|
| Missile Defense System Test-Bed Project |
| Fort Greely, Alaska, United States |
| 2005 |
| Nature of Representation:
Arbitrations
|
| Nature of Representation:
Mediations / Adjudications / DRBs / Negotiations
|
| Government:
Federal
|
Represented contractor in delay and other claims involving winter work in Alaska.
|
| Patent Infringement Action Involving Government Contract |
| Washington, District of Columbia, United States |
| 2004 |
| Nature of Representation:
Trials / Litigation
|
| Government:
Federal
|
Represented government contractor as intervener in patent infringement action filed under 28 U.S.C. §1498 and involving on-board oxygen generation system.
|
| Beaufort Military Complex Family Housing |
| Beaufort, South Carolina, United States |
| 2002 |
| Government:
Federal
|
|
| Tank Waste Remediation Project |
| Hanford, Washington, United States |
| 2000 |
| Nature of Representation:
Construction, Engineering and Project Contracts
|
| Government:
Federal
|
Nuclear waste clean-up at former weapons facility.
|
| Titan II Missile Project |
| Vandenberg, California, United States |
| 2000 |
| Nature of Representation:
Mediations / Adjudications / DRBs / Negotiations
|
| Government:
Federal
|
|
| Great Lakes Naval Station |
| Chicago, Illinois, United States |
| 1999 |
| Nature of Representation:
Trials / Litigation
|
| Government:
Federal
|
Default termination claims arising out of renovation of electrical system and installation of switch gear in military barracks.
|
| Norfolk Weapons Station |
| Norfolk, Virginia, United States |
| 1997 - 1998 |
| Nature of Representation:
Trials / Litigation
|
| Government:
Federal
|
Represented electrical contractor in claims brought by subcontractor for extra work and delays.
|
| Pit 9 Radioactive Waste Remediation Project |
| Idaho Falls, Idaho, United States |
| 1997 - 1998 |
| Nature of Representation:
Trials / Litigation
|
| Government:
Federal
|
Counseled two senior executives of Department of Energy contractor regarding their duties and responsibilities in complex conflict of interest situation and in resulting litigation between two subsidiaries of the same parent company.
|
| Bid Protest and Non-Responsibility Finding |
| Miramar Naval Air Station, California, |
| 1997 |
| Nature of Representation:
Trials / Litigation
|
| Government:
Federal
|
Overturned non-responsibility determination by Navy contracting officer and recovered damages for client.
|
| Marin Naval Reserve Facility |
| Hialeah, Florida, United States |
| 1994 - 1995 |
| Nature of Representation:
Trials / Litigation
|
| Government:
Federal
|
Default termination case brought by Navy.
|
| Weapons Storage and Security System Project NATO |
| Germany |
| 1993 - 1994 |
| Nature of Representation:
Trials / Litigation
|
| Government:
Federal
|
Represented contractor in resolution of pass-through claims by subcontractor against U.S. government.
|
| Peace Shield Project |
| Riyadh, Saudi Arabia |
| 1992 |
| Nature of Representation:
Trials / Litigation
|
| Government:
Federal
|
Claims arising out of defense installation in Saudi Arabia.
|
| Systems Engineering and Development Management Procurement Project |
| Yucca Mountain, Nevada, United States |
| 1992 |
| Nature of Representation:
Trials / Litigation
|
| Government:
Federal
|
|
| U.S. Navy Destroyer Fan Motors Litigation |
| Bath, Maine, United States |
| 1992 |
| Nature of Representation:
Mediations / Adjudications / DRBs / Negotiations
|
| Government:
Federal
|
Claims by subcontractor and U.S. Navy relating to defective ventilation fans on Arleigh Burke class destroyer.
|
| Titan IV Mobile Launch Platform |
| Vandenberg Air Force Base, California, |
| 1991 |
| Nature of Representation:
Trials / Litigation
|
| Government:
Federal
|
Defended Martin Marietta against $120 million claim from design-build subcontractor arising out of construction of mobile launch platform for Titan IV missiles.
|
| Consolidated Space Operations Center |
| Colorado Springs, Colorado, United States |
| 1988 - 1989 |
| Nature of Representation:
Mediations / Adjudications / DRBs / Negotiations
|
| Nature of Representation:
Trials / Litigation
|
| Government:
Federal
|
Represented contractor in claims against federal government in trial before Armed Services Board of Contract Appeals and in mini-trial.
|
| NASA Mobile Launch Platform |
| Cape Canaveral, Florida, United States |
| 1988 |
| Nature of Representation:
Trials / Litigation
|
| Government:
Federal
|
Trial arising out of project to reconfigure the space shuttle mobile launch platform.
|